Chin J Schisto Control ›› 2015, Vol. 27 ›› Issue (1): 22-.

Previous Articles     Next Articles

Effect of standardized construction of laboratories of schistosomiasis control institutions in Hubei Province in 2013

ZHU Hong* |ZHENG Zhao-hui|TANG Li|CAI Shun-xiang|HUANG Xi-bao|TU Zu-wu|QIN Jun|ZENG Ming-xing|SUN Qian|LIU Jian-bing   

  1. Hubei Center for Disease Control and Prevention|Hubei Province|Wuhan 430079|China
  • Online:2015-03-05 Published:2015-03-06
  • Contact: ZHU Hong

2013年湖北省血防专业机构实验室规范化 建设效果分析

朱红*|郑朝晖|唐丽|蔡顺祥|黄希宝|涂祖武|秦俊|曾明星|孙茜|刘建兵   

  1. 湖北省疾病预防控制中心 (武汉430079)
  • 通讯作者: 朱红
  • 作者简介:朱红| 女| 硕士| 主管医师。研究方向: 血吸虫病防治
  • 基金资助:
    国家科技支撑计划 (2009BAI78B07); 湖北省卫生厅血吸虫病防治科研项目 (XF2010?5、 XF2010?27、 XF2012?26)

Abstract: Objective Objective To investigate the effect and current situation of the standardized construction of laboratories of schis? tosomiasis control institutions in Hubei Province,so as to provide the evidence for establishing and improving the quality control system of diagnosis of schistosomiasis after the transmission of schistosomiasis was under control. Methods Methods According to the procedures of self?examination,field operation,and laboratory on?site,five laboratories were assessed,and all the results were analyzed comparatively. Results Results The average number of staffs were(7.00±1.58)persons,and the staffs of the laboratories of the schistosomiasis control institutions with senior professional titles in the city level were more than that in the county level(t = 5.563,P < 0.05) . The average space was(3.20±1.64)rooms,and the average area was(117.00±88.29)m2 . The average score of field operation was(96.40±4.49)points. The average score of laboratory on?site assessment was(106.6±6.15)points. The highest and lowest of the laboratory on?site assessment scores were environment and facilities(19.60 ± 0.55)points and manage? ment system of laboratory quality control(15.70±2.39)points(F = 2.869, P < 0.05),respectively. Conclusion Conclusion The cultiva? tion of laboratory staff should be strengthened,and the diagnostic capacity should be maintained and improved. The laboratory quality control system should be paid more attention to,and the construction and management of schistosomiasis laboratories should be standardized.

Key words: Schistosomiasis; Laboratory; Standardized construction; Hubei Province

摘要: 目的 目的 了解湖北省血防专业机构实验室规范化建设效果与现况, 为血吸虫病传播控制后建立、 完善诊断质控体 系提供参考依据。 方法 方法 对5座实验室按照自查、 现场操作考核、 实验室现场考核的程序进行考评, 并对各项得分情况 进行比较分析。 结果 结果 各实验室检测人员平均为 (7.00±1.58) 人, 其中市级血防机构实验室高级职称平均人数多于县级 (t =5.563, P < 0.05); 平均房屋 (3.20±1.64) 间, 平均面积 (117.00±88.29) m2 。现场操作考核总分平均 (96.40±4.49) 分; 实验 室现场考核总分平均 (106.60±6.15) 分, 其中环境与设施条件、 质量体系文件管理与实施分别为实验室现场考核得分最高 项 (19.60±0.55分) 与最低项 (15.70±2.39分)(F = 2.869, P < 0.05)。 结论 结论 血吸虫病传播控制后各地应继续加强检测人 才梯队建设, 强化检测水平的维持和提升, 重视质量管理体系, 规范实验室建设与管理。

关键词: 血吸虫病; 实验室; 规范化建设; 湖北省

CLC Number: